This High Point, NC home has been a three time jobsite for MCB. We initially remodeled a single guest bathroom for the homeowners. After an unusual tornado, rare for the area, came through and leveled their fence, they decided to have us build a beefier shadowbox style fence. The following summer, the master bathroom was ready for a full gut and remodel, in which we were called back. The remodel included re-framing the shower, full tile shower with glass surrounds, new tile flooring, fixtures, paint and trim.

 

 

  • Guest bath remodel
  • Master bath remodel
  • New tile shower
  • Glass shower surround
  • Fresh paint
  • New fixtures
  • Shadowbox fence build